Burlingame Community Center

Demolition of an existing single story building and new construction of a 36,000sf two-story above ground community center building. New construction will also include an outdoor pavilion with butterfly roofing, outdoor terraces, and single level underground parking garage. At the center of the newly constructed building, there will be a two-story grand entry with direct views through the building, looking into the park below. The central staircase will be an integral feature; ascending to a balcony overlooking the lobby and park below, connecting visitors to the upper level of the building.

Walnut Creek Intermediate School

Modernization, renovation, and one addition to the existing buildings and portables, as well as improvements to the school’s plazas and recreational spaces and relocation/removal of some of the parking spaces. Buildings 100, 150, 200, 400 and 600 will undergo extensive interior renovations and some exterior alterations by converting 5 of the 12 classrooms to office use in Building 100. Building 150 will be converted from the admiration space into two SDC classrooms with restroom and attached offices. Building 200 will convert three of the 12 classrooms into science labs. Building 400 will make extensive interior renovations and the removal of one appendage to the building. Building 600 will include an addition to the building. The remaining building 300, Library, Modular Building and portables will undergo interior modernizations with new fixtures, ceiling tiles and interior finishes. Exterior improvements and expansion of the school’s plazas, and recreational spaces will be included in the modernization.

Terra Linda High School New Gymnasium

New construction of a 18,522sf competition gymnasium. Work includes demolition of the existing cafeteria and kitchen building and associated site work. Additional work includes the renovation and reconfiguration of the campus frontage to support the new building and site entry/exit. Frontage improvements from the north entry to the beginning of the student parking, and adjacent to the football field.

Library Learning Resource Center

The new Library/Learning Resource Center project is located in the heart of the Solano Community College campus. This Project includes construction of a new 59,252 sf two-story building and demolition of the 49,074 sf old library building. The new LLRC building will contain library functions, tutoring programs, TV Studio programs, the professional development office and training room, and the District’s Data Center and IT department. The foundation system will include rammed aggregate piers, footings and grade beams and floor slab. The main vertical and horizontal building structure will be steel moment frame. The new building includes two elevators, two large open stairs, a bleacher-type tiered seating area, and a very large membrane skylight and corresponding atrium-type opening in the second floor.

(View in Gallery)

New Science Building at Contra Costa College

New construction of a 3-story, 55,000sf. science building at Contra Costa College’s San Pablo campus. New classrooms will include teaching laboratories, laboratory support spaces, student study and tutorial spaces, general-use classrooms, meeting rooms, faculty offices, and related support spaces. The building will also feature a new planetarium.

(View in Gallery)

Maintenance & Operations Facility at College of Marin

Construction of two prefabricated metal buildings for storage, shipping and receiving, shops, and offices for facility staff.

 

Parkside Elementary School Replacement Campus

New construction of a elementary school facility, including a parking lot, hardscaping and landscaping at the playfields area located to the south of the existing campus; hazardous materials abatement and demolition of the existing school facility and construction of new playfields, a parking lot, hardscaping and landscaping at the location of the former school facility.

(View in Gallery)

Chemistry Seismic & Life Safety Corrections at UC Davis Campus

Seismic strengthening of the Chemistry Annex Building including foundation upgrades, concrete bracing and fiber reinforced polymer (FRP) wrapping of columns, a new transformer and generator (to serve a fire pump provided under a separate project), and the following accessibility improvements: New sloped walkways at three (3) primary entries. Enclosure of a 2-story atrium with accessible restrooms at the basement and 1st Floor. Renovation of three (3) existing restrooms. New accessible eyewash/showers and drinking fountains.

San Marin High School Performing Arts Center & STEM Building

STEM – The new STEM building will consist of a single-story, 24-foot-high building and associated improvements including a courtyard, outdoor project area, and landscaping. The building will be  approx. 18,466sf. There will be ten classroom/labs, and three tables to create an additional outdoor classroom space to accommodate 320 students.
PAC – The new single-story performing arts center will be 1,545sf. larger than the existing PAC. It will contain  a total of 8,010sf.of usable space with seating or 217 auditorium guests.

(View in Gallery)

Terra Linda High School Student Commons

Construction of a new two-story building consisting of cafeteria, kitchen, library, classrooms, and a theater. The fully sprinklered 33,000sf. Building will be type II-B steel braced frame construction with metal stud walls. The site work will include a new plaza between the new building and the existing structures.

(View in Gallery)

PSE Library & Seismic Upgrade Project at UC Davis Campus

Seismic retrofit of the existing Physical Sciences an Engineering Library, and a renovation of the 2nd and 3rd floors. The renovation includes a change of the library use to new offices and meeting spaces for Quantum Mathematics and Physics department. Each floor is approximately 32,000sf, with a basement and 3 floors above ground.

Harder Elementary School

Construction of a new elementary school campus on 7.5 acres in Hayward. 75,000sf. Total. Classroom spaces, flex spaces, multi-purpose room, library kitchen, and cafeteria. Athletic facilities include outdoor play fields and structures. Scope also includes demolition of existing school campus including: buildings, athletic fields, and play structures.

(View in Gallery)

River Charter School Modernization

Modernization to the existing campus at Salvador elementary school and new construction of the River Charter School campus. Scope includes selective demolition, sitework, and landscaping.

Cherryland Elementary School Increment #2

New construction of an elementary school campus. Construction includes four (4) permanent buildings (administration, classroom, library, and multi-purpose) and the installation of two (2) modular buildings, as well as all associated site work (paving, shade structures, hardscape and landscape).

(View in Gallery)

Half Moon Bay Library a LEED Platinum and Net-Zero Energy Structure

Construction of a new 22,000sf two-story library building. Highlights of the state-of-the-art building include a collaborative marker space with 3D printers, ample access to technology, an expansive children’s room with separate entryway, a reading room, a dedicated flexible “teen room”, several small study rooms, and a large community room that accommodates over 100 people. The building also features large windows and doors that connect the library to the courtyard and garden.

(View in Gallery)