Subcontractor Prequalification Questionnaire (pdf 797KB)

Please note that the first section of the questionnaire (scoring) is for informational purposes and does not need to be completed by the subcontractor.

Standard Subcontract Agreement (130KB)

#203 Allen Elementary School Project

  1. Allen Bid Documents

#200 – Terra Linda High School Summer 2020 Project

  1. TLHS Summer 2020 – Bid Documents (zip 77MB)
  2. TLHS Summer 2020 – Bid Clarification #1 (1 MB)
  3. TLHS Summer 2020 – DSA Approved Documents (75MB)

#199 – Walnut Creek Intermediate School Modernization

1.Walnut Creek As-builts – 1 of 2 (zip 168MB)

2. Walnut Creek As-builts – 2 of 2 (zip 173MB)

3. Walnut Creek – Increment 1 – Package (zip 43MB)

4. Walnut Creek – Increment 2 – Package 1 of 2 (zip 30MB)

4.1 Walnut Creek – Increment 2 – Package 2 of 2 (zip 44MB)

5. Walnut Creek – Increment 3 – Package 1 of 2 (zip 28MB)

5.1 Walnut Creek – Increment 3 – Package 2 of 2 (zip 41MB)

6. Walnut Creek – Bid Clarifications (zip 170MB)

7. Walnut Creek – Hazmat Reports (zip 2MB)

8. Walnut Creek Inc 2 & 3 – Addendum #1 (33KB)

9. Walnut Creek Inc 2 & 3 – Addendum #2 (1MB)

#198 – TLHS Gym Design-Build

  1. TLHS Gym – Surveys & As-builts (zip 34MB)
  2. TLHS Gym – 100% DD Drawings (zip 78MB)

TLHS Gym Bidding Documents

  1. TL Gym – Gas Map provided by PG&E (zip 378KB)
  2. TL Gym – Hazardous Material Reports (zip 7KB)
  3. TL Gym – Increment #1 Plans (zip 45MB)
  4. TL Gym – Increment #1 Specs (zip 14MB)
  5. TL Gym – Prelim Geo Investigation Report (zip 45MB)
  6. TL Gym – Soils Reports & Supp Reports (33zip)
  7. TL Gym – Survey & As-Builts (zip 34MB)
  8. TL Gym – Bid Clarification #1 (zip 17MB)
  9. TL Gym – Bid Clarification #2 (zip 47B)