Subcontractor Prequalification Questionnaire (pdf 797KB)
Standard Subcontract Agreement (130KB)
#199 – Walnut Creek Intermediate School Modernization
1.Walnut Creek As-builts – 1 of 2 (zip 168MB)
2. Walnut Creek As-builts – 2 of 2 (zip 173MB)
3. Walnut Creek – Increment 1 – Package (zip 43MB)
4. Walnut Creek – Increment 2 – Package 1 of 2 (zip 30MB)
4.1 Walnut Creek – Increment 2 – Package 2 of 2 (zip 44MB)
5. Walnut Creek – Increment 3 – Package 1 of 2 (zip 28MB)
5.1 Walnut Creek – Increment 3 – Package 2 of 2 (zip 41MB)
6. Walnut Creek – Bid Clarifications (zip 170MB)
7. Walnut Creek – Hazmat Reports (zip 2MB)
8. Walnut Creek Inc 2 & 3 – Addendum #1 (33KB)
9. Walnut Creek Inc 2 & 3 – Addendum #2 (1MB)
#200 – Terra Linda High School Summer 2020 Project
- TLHS Summer 2020 – Bid Documents (zip 77MB)
- TLHS Summer 2020 – Bid Clarification #1 (1 MB)
- TLHS Summer 2020 – DSA Approved Documents (75MB)
TLHS Gym Design-Build
- TLHS Gym – Surveys & As-builts (zip 34MB)
- TLHS Gym – 100% DD Drawings (zip 78MB)
TLHS Gym Bidding Documents
- TL Gym – Gas Map provided by PG&E (zip 378KB)
- TL Gym – Hazardous Material Reports (zip 7KB)
- TL Gym – Increment #1 Plans (zip 45MB)
- TL Gym – Increment #1 Specs (zip 14MB)
- TL Gym – Prelim Geo Investigation Report (zip 45MB)
- TL Gym – Soils Reports & Supp Reports (33zip)
- TL Gym – Survey & As-Builts (zip 34MB)