Mariano Castro Traditional School/Gabriela Mistral Dual Immersion School Ph 2   –  $23.9 Mil

(View in Gallery)

Construction of new classroom buildings, library, and multi-use room with associated utilities and site improvements.

Antioch High School Phase 1B Package 2 Cafeteria Building  –  $11.1 Mil

1B2 – Cafeteria Building: New construcion of 18,000sf café including kitchen, eatery and campus site work.  1C2 – Building 1100: Remodel of existing classrooms involving abatement, new interior walls, new media center, upgraded lighting, upgraded MEP’s, restrooms and site improvements.

West Valley College – School of Professional Studies  –  $13.6 Mil

Renovation of existing Business division and Administrative Justice Division buildings for a total of 29,000 SF. Renovation consists of complete removal of all interior walls and majority of all exterior walls for seismic upgrades, ADA upgrades, new fire sprinkler system and Mechanical, Electrical, & Plumbing upgrades for classrooms, laboratory room, lecture room, and faculty offices.  Site improvements included ADA upgrades and student lounge.

(View in Gallery)

West Valley College – Kvamme Planetarium  –  $5.1 Mil

New construction of state of the art planetarium building addition at the West Valley College. The planetarium Building is a concrete foundation with CMU primary shear walls with structural steel support framing and concrete roof deck. The roof deck includes a roof observatory with architectural metal wall panels on all building elevations with a custom door entrance. The support MEP infrastructure is included as well for the planetarium projection dome, projector lifter assembly.

(View in Gallery)

Holt Building & Budd Shop Modernization – Increment 2  –  $11.4 Mil

Renovation of San Joaquin Delta College consisting of upgrades to 7 industrial shops including Mechanical, Electrical, & Plumbing upgrades, interior finish refresh and site improvements.

Woodside HS – Wing J New Classroom Building & Bradley Field  –  $16.4 Mil

Construction of a new 24,760sf 2-story classroom building with standard classrooms and Science lab classrooms. All new site improvements include a new courtyard  The project also included new sports fields for campus.

(View in Gallery)

Carlmont High School New Classroom Building Increment 2 & Café/Locker Room Remodel  –  $16.5 Mil

New construction of a classroom wing to house 10 new state-of-the-art classrooms. This consists of 6 general-use, 3 state-of-the art science labs, and one photo-journalism classroom. Ample storage space, large white boards, air conditioning, and microphone systems for the teachers are included in every classroom. The majority of the second floor is made up of glass windows with an indoor lobby area that overlooks the newly constructed courtyard. Our work also consisted of all associated site-work and landscaping.

The Café & Locker Room Remodel consisted of demo including hazardous abatement of existing café and locker rooms. Construction of new locker room facilities for boys and girls including a new café. New facilities were for ADA compliance also new updated kitchen equipment. Complete MEP upgrades in the facilities was performed.

(View in Gallery)

Solano Community College Bldg 1200 Theater Renovation  –  $14.8 Mil

Modernization to the existing theater building. The work included demo of the interior of the existing theater building. The new work consisted of new audience seating layout, catwalk systems, plumbing, mechanical, & electrical systems. New audio/visual and production lighting and rigging systems installed to create a new state of the art theater building.

(View in Gallery)

Napa South Campus Improvements  –  $12.5 Mil

Interior tenant improvements to South Campus Buildings 1 & 2. Included finished door modifications, food service equipment, structural strengthening upgrades, addition of tubular skylights, life safety upgrades, and the replacement of mechanical, plumbing, fire sprinkler, and electrical systems.

Longfellow Elementary School Modernization  –  $11.9 Mil

Seismic retrofit of an occupied elementary school. Mechanical, Electrical, Plumbing, and ADA upgrades for an 8-phased project.  The project included construction of a new elevator within the building and site upgrades.

(View in Gallery)

Latimer Elementary School Phase 2  –  $1.6 Mil

Technology and audio/visual upgrades, installation of skylights, ADA upgrades, flooring replacement, repainting of building interiors, and installation of tackable wall panels in classrooms. Upgrades of an existing campus; Buildings A, B, E/F, G and H.

Graham Middle School Auditorium  –  $6.8 Mil

14,000sf – Construction of a new middle school Auditorium with surrounding sitework and landscaping.

(View in Gallery)

Graham Middle School 2 Story Classroom  –  $4.2 Mil

Construction of new 2-story classroom building and associated site and utility work.

(View in Gallery)

Crittenden Middle School New Auditorium & Library  –  $18.9 Mil

Construction of a new 2-story bulding, Library building, and Auditorium building. Surrounding site work and landscaping.

(View in Gallery)

Hall Middle School Modernization  –  $5.5 Mil

Modernization for Library Building 100 and Buildings 300, 400 & 500.

James Lick Middle School Modernization  –  $20.1 Mil

Seismic retrofit, Mechanical, Electrical, Plumbing, & ADA upgrades for a 13-phase occupied school site. ADA upgrades to interior and exterior, and site work including construction of new elevator tower building.

(View in Gallery)

De Anza High School Building 10 Linked Learning Center  –  $18.4 Mil

Construction of a new 17,000sf building built on an occupied campus, in addition to numerous turf fields, parking lots, and newly landscaped areas.

(View in Gallery)

Jose Ortega Elementary School Modernization  –  $11.2 Mil

Modernization of 33,000sf school campus with new construction of 5,000sf main lobby. Included site improvements with all new site access ramps and landscaping.

 

UC Davis Housing Administration Building Renovation & Regan Hall Seismic  –  $3.2 Mil

Located in a heavy pedestrian area of the UC Davis campus, this project included renovation & upgrades to (3) different housing buildings.  North Building: 6,517 sq. ft. Seismic upgrades & replacement of existing HVAC system, new fencing at exterior mechanical yard, replacement of roofing and exterior cladding & trim, and select interior finishes and replacement of corridor ceilings.  South Building: 8,878 sg. ft. Seismic upgrades & new HVAC controls, replacement of roofing, full exterior paint, new suspended ceiling fixtures and Lobby & Library, interior finish & lighting replacement.  Regan Mechanical Building: 325 sq. ft. Seismic upgrades and replacement of exterior trim, plaster skim coating & exterior paint.

West Valley Elementary School Modernization  –  $5.7 Mil

Construction commenced in June 2014 and was completed in August 2015.  By working closely with our subcontractors, BHM successfully delivered a high quality finished project while maintaining a safe environment on an occupied campus.

George Peabody Elementary School New Multi-Purpose Building & Modernization  –  $7.2 Mil

Construction of new 2-story multi-purpose building and modernization of the existing classroom and administrative buildings.  Work included, but was not limited to, the replacement of restrooms, flooring, ADA access upgrades, hazmat abatement, and a major rehabilitation of the HVAC units.

(View in Gallery)

Evergreen Valley College Interim Police Station

Completed in less than four (4) months, this campus police station included security systems, Kevlar reinforced walls, & extensive underground utility work.

California State University-East Bay Organic Chemistry Laboratory

This project, located in Concord, CA involved renovating existing classrooms into science labs.  Despite the long lead times for material procurement, the $1.4 million project was completed in three (3) months.

Chabot Community College Bldg 3400

A renovation of an existing classroom building into a “state of the art” BMW training center.  Slated to take eight (8) months, BHM completed this project in less than six (6) months while maintaining a high level of finish.

University Of California-Berkeley Calvin Laboratory Remodel

Located on the UC Berkeley campus, this $2.1 million fast track project included new mechanical, electrical, and plumbing systems, structural modifications, and new finishes.  The project was completed within the four (4) month scheduling constraints.

San Leandro High School Modernization & Voluntary Seismic Upgrades

Due to window procurement constraints, this $2.5 million project was originally planned to encompass two (2) summers.  By working closely with both the subcontractors and design team, BHM was able to complete the project in one (1) summer.

Mills High School Civil Improvements

This $2.6 million civil project was completed within the 60 calendar day schedule.  Work included new play courts, pool enclosures, AC paving & walkways, in addition to extensive landscaping.