Town Hall Campus Renovations & Addition, Town of Colma

$9.9 Million – Design-Bid Delivery

This project consisted of the Historical renovation of the existing “Town Hall” building. Work included upgrades to existing finishes, structural upgrades/elements, mechanical, electrical and plumbing system upgrades and the renovation of 2,500sf. of floor space. New construction consisted of a 7,000sf. addition to the backside of the building including site work, landscaping, and hardscape

 Mountain View Community Center – LEED Silver

$17.4 Million – Design-Bid Delivery

Work consists of renovation to the existing building and new construction of a 10,000sf addition. Highlights of the newly renovated center include a banquet room with a private patio that can accommodate 200 guests, several auxiliary rooms, a kitchen that accommodates 100, and plenty of parking and access to public transportation.

(View in Gallery)

Half Moon Bay Library – LEED Gold

$18.4 Million – Design-Bid Delivery

At 22,000 sf., the newly-constructed two-story Half Moon Bay Library will better serve the Coastside communities with quiet reading and study rooms, an expansive children’s room, a teen room, collaborative makerspace, and inviting indoor/outdoor spaces including a large community room and gardens. Accessible parking, landscaping, and off-site improvements were also included.

(View in Gallery)

Bridge Yard Seismic and Renovation, San Francisco Bay Bridge

$5.9 Million – Design-Bid Delivery

Project consisted of seismic upgrades for the 20,000sf. historic Caltrans Bridge Yard building, including renovation to the exterior and interior of the building to restore all of the original historic features.

(View in Gallery)

Napa South Campus Improvements

$12.5 Million – Design-Bid Delivery

Interior tenant improvements to South Campus Buildings 1 & 2. Scope included finished door modifications, new food service equipment, structural strengthening upgrades, addition of tubular skylights, life safety upgrades, and the replacement of mechanical, plumbing, fire sprinkler, and electrical systems.

Napa Therapeutic Childcare Center & Crisis Stabilization Services

$4.9 Million – Design-Bid Delivery

Tenant improvements to existing buildings. New childcare and crisis stabilization center, interior building upgrades including finishes and lighting, and associated site improvements and landscaping.

San Mateo Bridge Toll Plaza

$251 Thousand – Design-Bid Delivery

This toll plaza is located between San Mateo and Hayward. Our company removed and replaced the roofing, made ADA improvements, and renovated miscellaneous site railings. The work took place over an active freeway and bridge and was completed without incident.

Palo Alto Fire Stations #5 and #8

$1 Million – Design-Bid Delivery

The Fire Station buildings #5 and #8 are located in Palo Alto, CA. The renovation of the existing fire stations included new finishes, windows, and roofing, as well as electrical and mechanical system upgrades.

Hamilton Pool

$3 Million – Design-Bid Delivery

The Hamilton Pool project, located in Novato, is a renovation of the original pool and bath house for the Officer’s Club of the Hamilton Air Force Base that built in 1936. Our work included replacement of the pool, restoration of the original unreinforced stone retaining wall, removal of the stone chimney, and incorporating the material into a new accessible ramp. Work also included the installation of new retaining walls to protect the original landscape.

(View in Gallery)

Belvedere City Council Chamber

$282 Thousand – Design-Bid Delivery

This project, located in Belvedere, CA, is a renovation of the historic building utilized by the Belvedere City Council. The building was originally built in 1914 and served as a Presbyterian Church. Our work on the renovation included ADA upgrades, restoration of the original interior woodwork, rehabilitation of the original window hardware, and new architectural wood work and mill work.