Maintenance & Operations Facility – College of Marin

$10.3 Million – Design-Bid Delivery

Construction of two prefabricated metal buildings for storage, shipping and receiving, shops, and offices for facility staff.

Parkside Elementary School Replacement Campus

$44 Million – Design-Bid Delivery

New construction of a elementary school facility, including a parking lot, hardscaping and landscaping at the playfields area located to the south of the existing campus; hazardous materials abatement and demolition of the existing school facility and construction of new playfields, a parking lot, hardscaping and landscaping at the location of the former school facility.

Chemistry Seismic & Life Safety Corrections – UC Davis Campus

$14.8 Million – Design-Bid Delivery

Seismic strengthening of the Chemistry Annex Building including foundation upgrades, concrete bracing and fiber reinforced polymer (FRP) wrapping of columns, a new transformer and generator (to serve a fire pump provided under a separate project), and the following accessibility improvements: New sloped walkways at three (3) primary entries. Enclosure of a 2-story atrium with accessible restrooms at the basement and 1st Floor. Renovation of 3three (3) existing restrooms. New accessible eyewash/showers and drinking fountains.

San Marin High School – Performing Arts Center & STEM Building

$25 Million – Lease-Leaseback Delivery

STEM – The new STEM building will consist of a single-story, 24-foot-high building and associated improvements including a courtyard, outdoor project area, and landscaping. The building will be  approx. 18,466sf. There will be ten classroom/labs, and three tables to create an additional outdoor classroom space to accommodate 320 students.
PAC – The new single-story performing arts center will be 1,545sf. larger than the existing PAC. It will contain  a total of 8,010sf.of usable space with seating or 217 auditorium guests.

(View in Gallery)

Terra Linda High School – Student Commons

$23 Million – Lease-Leaseback Delivery

Construction of a new two-story building consisting of cafeteria, kitchen, library, classrooms, and a theater. The fully sprinklered 33,000sf. Building will be type II-B steel braced frame construction with metal stud walls. The site work will include a new plaza between the new building and the existing structures.

(View in Gallery)

PSE Library & Seismic Upgrade Project – UC Davis Campus

$11 Million – Design-Bid Delivery

Seismic retrofit of the existing Physical Sciences an Engineering Library, and a renovation of the 2nd and 3rd floors. The renovation includes a change of the library use to new offices and meeting spaces for Quantum Mathematics and Physics department. Each floor is approximately 32,000sf, with a basement and 3 floors above ground.

Harder Elementary School

$44.5 Million – Lease-Leaseback Delivery

Construction of a new elementary school campus on 7.5 acres in Hayward. 75,000sf. Total. Classroom spaces, flex spaces, multi-purpose room, library kitchen, and cafeteria. Athletic facilities include outdoor play fields and structures. Scope also includes demolition of existing school campus including: buildings, athletic fields, and play structures.

(View in Gallery)

San Marin High School Stadium Lighting & PA System Project

$1.1 Million – Design-Bid Delivery

New stadium lighting and new public announcement system for the football stadium at San Marin High School.

River Charter School Modernization

$19.1 Million – Design-Bid Delivery

Modernization to the existing campus at Salvador elementary school and new construction of the River Charter School campus. Scope includes selective demolition, sitework, and landscaping.

Happy Valley & Lafayette Elementary School(s) Electrical & HVAC

$5.9 Million – Design Bid-Delivery

Happy Valley Elementary (41,528sf.) – Complete upgrades to fire systems, mechanical systems, and electrical systems for eleven (11) classrooms.

Lafayette Elementary (42,271sf.) – Complete upgrades to fire systems, mechanical systems, and electrical systems for thirteen (13) classrooms.

Mariano Castro/Gabriela Mistral Dual Immersion School Phase 4

$5.4 Million – Lease-Leaseback Delivery

Selective demolition and interior modernization to existing classrooms.

Parkway Heights Middle School Modernization Phase II

$2.2 Million – Design-Bid Delivery

Modernization of an existing classroom building and all associated sitework.

Burton Valley Elementary School Maintenance, Electrical, & HVAC

$6.9 Million – Design-Bid Delivery

Complete upgrades to all unit ventilation, fire systems, mechanical, and electrical systems for 15 classrooms.

El Centro Elementary School Increment #1

$11.5 Million – Design-Bid Delivery

New construction of a 24,000sf. multi-purpose building, and modernization to two (2) 38,000sf. classroom buildings. Work also includes the re-purpose of an existing 24,000sf. building which we will then convert into a library. Associated work for five (5) owner-purchased permanent modular buildings that includes stucco work to the outside of the buildings as well as all concrete work. New campus common area, two new playgrounds, the re-configuration of an existing parking lot and addition of a new parking lot.

(View in Gallery)

Cherryland Elementary School Increment #2

$42.7 Million – Design-Bid Delivery

New construction of an elementary school campus. Construction includes four (4) permanent buildings (administration, classroom, library, and multi-purpose) and the installation of two (2) modular buildings, as well as all associated site work (paving, shade structures, hardscape and landscape).

(View in Gallery)

Town Hall Campus Renovations & Addition, Town of Colma

$9.9 Million – Design-Bid Delivery

This project consists of the Historical renovation of the existing “Town Hall” building. Work includes upgrades to existing finishes, structural upgrades/elements, mechanical, electrical and plumbing system upgrades and the renovation of 2,500sf. of floor space. New construction consists of a 7,000sf. addition to the backside of the building including site work, landscaping, and hardscape.

Mountain View Community Center – LEED Silver

$17.4 Million – Design-Bid Delivery

Renovation to the existing interior of the community center building with an addition of 10,000sf. The renovated community center highlights include a banquet room that accommodates 200 people for dining with a private patio, several auxiliary rooms, including a kitchen which can accommodate up to 100, and plenty of parking and access to public transportation. Scope includes associated site work and landscaping.

(View in Gallery)

Mariano Castro/Gabriela Mistral Dual Immersion School Phase 2

$24.1 Million – Design-Bid Delivery

Construction of an elementary school campus. Includes new classroom buildings, library, and multi-use room with associated utilities and site improvements. With seven (7) buildings being constructed in succession, the designated staging has been mapped out across the site for all subcontractors.

(View in Gallery)

Half Moon Bay Library – LEED Gold and Net-Zero Energy

$18.4 Million – Design-Bid Delivery

Construction of a new 22,000sf. two-story library building. Highlights of the state-of-the-art building include a collaborative marker space with 3D printers, ample access to technology, an expansive children’s room with separate entryway, a reading room, a dedicated flexible “teen room”, several small study rooms, and a large community room that accommodates over 100 people. The building also features large windows and doors that connect the library to the courtyard and garden.

(View in Gallery)