Mountain View Community Center

Renovation of the existing community center building including a 10,000sf addition.

Half Moon Bay Library

Construction of a 22,000sf 2-story library with parking, landscaping, and off-site improvements.

Mariano Castro Traditional School/Gabriela Mistral Dual Immersion School Ph 2

Construction of new classroom buildings, library, and multi-use room with associated utilities and site improvements.

Antioch High School Phase 1B Package 2 Cafeteria Building

1B2 – Cafeteria Building: New construcion of 18,000sf café including kitchen, eatery and campus site work.  1C2 – Building 1100: Remodel of existing classrooms involving abatement, new interior walls, new media center, upgraded lighting, upgraded MEP’s, restrooms and site improvements.

West Valley College – School of Professional Studies

Renovation of existing Business division and Administrative Justice division buildings for a total 9,000 SF. Renovation consists of complete removal of all interior walls and majority of all exterior walls for seismic upgrades, ADA upgrades, new fire sprinkler system and MEP upgrades for classrooms, laboratory room, Lecture room, and faculty offices.  Site improvements included ADA upgrades and student lounge.

West Valley College – Kvamme Planetarium

New construction of state of the art planetarium building addition at the West Valley College. The planetarium Building is a concrete foundation with CMU primary shear walls with structural steel support framing and concrete roof deck. The roof deck includes a roof observatory with architectural metal wall panels on all building elevations with a custom door entrance. The support MEP infrastructure is included as well for the planetarium projection dome, projector lifter assembly.

Holt Building & Budd Shop Modernization – Increment 2

Renovation of San Joaquin Delta College consisting of upgrades to 7 industrial shops including MEP upgrades, interior finish refresh and site improvements.

Woodside HS – Wing J New Classroom Building & Bradley Field  –  $16.4 Mil

Construction of a new 24,760sf 2-story classroom building with standard classrooms and Science lab classrooms. All new site improvements include a new courtyard  The project also included new sports fields for campus.

Carlmont High School New Classroom Building Increment 2 & Café/Locker Room Remodel  –  $16.5 Mil

New construction of a classroom wing to house 10 new state-of-the-art classrooms. This consists of 6 general-use, 3 state-of-the art science labs, and one photo-journalism classroom. Ample storage space, large white boards, air conditioning, and microphone systems for the teachers are included in every classroom. The majority of the second floor is made up of glass windows with an indoor lobby area that overlooks the newly constructed courtyard. Our work also consisted of all associated site-work and landscaping.

The Café & Locker Room Remodel consisted of demo including hazardous abatement of existing café and locker rooms. Construction of new locker room facilities for boys and girls including a new café. New facilities were for ADA compliance also new updated kitchen equipment. Complete MEP upgrades in the facilities was performed.